Manure moving day

On the 4th April, we were able to start loading all the boys cubicles with the manure that had been collected earlier in March. All 10 IBC containers in the boys cubicles had been secures and piping attached. 1000 litres of both cow and goat manure had been collected and left for microbial reactions to take place, where methane bubbles were being produced. It is essential that we loaded some of the containers with the manure so that the microbial reaction that causes the methane to be produced could be kick started. Take a look here: